Attic Demolition Part Two
Work on the attic took a few weeks to accomplish. All the boards that formed the walls were removed, nails pulled out, and stacked up. All the insulation was removed except in areas where the electrical wires were a total maze, and downright scary to be around.
The next step was to remove the carpet.
No comments:
Post a Comment